|
Wireframe Difference
To access this dialog:
-
Activate the Surfaces ribbon and select Operations | Boolean | Difference
The Difference operation takes two open or closed wireframe objects (or two selections of wireframe triangle data, or a combination of object and selection) and creates another wireframe object which represents the first wireframe data with any volume shared with the second wireframe data removed.
Selection order is important, the result of (Wireframe 1 - Wireframe 2) is different from (Wireframe 2 - Wireframe 1)
Note: This command supports flexible wireframe selection.
Example
Original Wireframe Objects |
||
Object 1 |
Object 2 |
Output |
|
|
|
|
|
|
Field Details:
Wireframe 1/2: for Wireframe 1 and Wireframe 2, either select a loaded wireframe object, or choose the Selected triangles option and select wireframe data interactively in a 3D window, storing the selection for each input using the appropriate Store current selection button. A combination of object and triangle selection is permitted.
Output: you can output data either within the Current object, an existing wireframe object (pick it from the list) or a new object (type a new name).
Related Topics | |
|